Glossary

The words Obtempera uses, and what they mean here.

Last checked: 2026-11-06
TermMeaning
0-10 scale / eNPSA question answered from 0 to 10. Its eNPS (employee Net Promoter Score) is the percentage answering 9 or 10 less the percentage answering 0 to 6, from -100 to 100.
Add-onA module switched on per Customer by Obtempera: Training, Audits, Licensing, Whistleblowing, Employment Status, Communications, Reporting & Risk, AI assistance, UK right-to-work checks and Site Induction. While it is off it is gone for everyone, and nobody can set it up.
Agreement scaleA question answered on five points, 1 Strongly disagree to 5 Strongly agree (or the question's own words); % agree is the share answering 4 or 5.
ArchivedA Worker record taken out of use instead of deleted, because something is held against it: every placement on it ends, and it can be restored.
Assignment / placementOne Worker on one Project: the compliance record lives here, and it has one status and one colour.
Basic Worker dataWhat an EHS Administrator, a Licence Reviewer or a Report Viewer sees of a Worker they reach only through that role: name, employer, Projects and Job Category, with the Worker's compliance. No email address, no other My Details or form answer, and no My Details file. Someone who also holds a fuller role (HR, an administrator, System Admin) reads the whole record.
Break-glassHow a System Admin opens a Worker's documents and other evidence: a reason is given and recorded, and the window closes after 30 minutes. While open, a banner on every page shows the end time and a Close now button.
Calculated / Pre-filledA value a rule fills in on a form. Calculated is locked; Pre-filled — you can change this is a suggestion the person may answer over.
CalendarThe page behind the calendar icon in the top bar: the dates that matter for a Contractor's own Workers and its subcontractors' Workers, such as documents, licences and training running out, status changes, form dates, company dates and audit actions. For Contractor and Customer Administrators, Report Viewers and System Admin. See Contractor Calendar.
Chain ReviewA switch per Project, off unless the Customer Administrator switches it on. On, the Contractor directly above a Worker's Contractor reviews them (HR, EHS and Licensing); the Customer's reviewers still read every record and can reopen any decision. See Chain Review.
Claim codeThe code an anonymous reporter uses, with the report's reference, to follow their report; shown once.
Cleared for siteWhat the site pass shows in green (or in amber when a required item expires soon): Compliant on that Project, the Project ready for Workers and not suspended or finished, and the Worker's record active.
Compliance MatrixEvery Worker on every Project, item by item, in the four colours.
Compliance recordThe questions and documents a Project asks of a Worker or Contractor, and their review.
ContractorA company working for a Customer. A Customer's own directly employed staff are its direct workforce, a Contractor of a special kind: it files no Country Compliance Declaration and its Country Compliance reads "Not applicable".
CountryA Customer's presence in a country, with its own rules (a Tenant Country).
Country ComplianceThe Country Compliance Declaration a Contractor files for each Country it works in, reviewed by HR for that Country, and the switch per Country on the Customer record that decides whether it is asked for. Switched off, nobody files one; switched back on, Contractors have 30 days (by the Country's calendar) to submit.
CustomerThe organisation that owns the sites and the compliance rules: the end client.
DisclosureA whistleblowing report. Handlers read them; the Disclosure Administrator runs the channel.
Email AlertAn email the platform sends on an event or ahead of a date; only Obtempera's System Administrators set its wording and recipients.
Employment status assessmentThe questionnaire and determination for a self-employed Worker (CIS, IR35, RCT).
EngagerFor employment status: the company engaging a self-employed Worker, which sends the assessment and records the outcome.
Existing questionsEvery question the platform knows, with its type: listed in each form's + Add question drawer (there is no separate Field Library page).
FormAn arrangement of questions for a purpose: the Worker form, the Contractor Country form, a survey, an assessment.
Form templateEvery form is kept in Form Templates. A fixed section is the part a form needs in order to work (who is reporting, the engager's outcome); it is locked, and your own sections and questions go around it.
The four coloursGrey not checked yet (getting started, with the Worker, in review, or ended), Green Compliant (cleared for site), Amber Compliant and still cleared for site, but a required document, licence or course expires soon, Red not compliant (sent back, Training outstanding, something expired or lapsed, or the placement is suspended). The colour follows the status, except that a required item expiring soon turns Green to Amber, and one that has expired turns any live placement Red. See Worker statuses and colours.
Health checkSystem Admin's list of what is missing at each Customer and Contractor, worst first, with where to fix it.
Inactive (placement)A placement that has ended: grey, and not counted in totals.
Inactive ContractorA Contractor set to Inactive takes no new work: it adds, imports and invites no Workers, invites no subcontractors and joins no new Project. Its existing Workers and their assignments carry on. A Customer Administrator of that Customer, or System Admin, sets it Active again.
Issue dateWhen a survey was sent. Every answer counts under its survey's issue date, whenever it came in; a survey series compares surveys in issue-date order.
LicenceA card or certificate in the catalogue (Safe Pass, CSCS, a plant ticket).
Licence requestA Customer Administrator's request to add a licence missing from the list. Obtempera's System Admin decides it on Licence Requests.
Licence ReviewerThe role that checks each licence a Worker records against the card, on Licensing Review.
Not compliant – renewal neededWhat a Worker reads when a required document, licence or course has lapsed on a Project. Only the renewal is reviewed; the review pages read Not compliant.
O.B.The guide in the bottom corner, for everyone signed in. He points out what needs you, one thing at a time; with nothing new to say he offers Help for this page, which opens the article for the page beside it. Administrators, reviewers and Report Viewers also get short tours of a page on a tablet or a computer; Workers get tips only, in their language, and someone who is also a Worker gets their Worker tips first. On a phone he is a strip under the top bar, there only when he has a tip, and a tour becomes a link reading Open the page. He is never on the whistleblowing pages or the public reporting form, and a country toolkit has its own O.B. inside the page. See Getting help.
ProjectA site or contract in a Country, with its own review stages and requirements.
Renewal dueA required document, licence or course still valid but running out soon. The Worker is reminded, shows amber and stays cleared for site.
Report ViewerA role that reads and changes nothing, for a whole Customer or for one Contractor and the subcontractors below it, with basic Worker data only. It runs and exports reports, and saves and schedules its own. See Starting as a Report Viewer.
Review orderUnder Customer Settings: whether EHS or Licensing comes next after HR, where a Project uses both.
Review stagesHR review, EHS review and Licensing review. Every Project has HR review, always first; it adds EHS and Licensing if it needs them.
Right to work checkWith the UK right-to-work add-on, the check an HR reviewer runs on a UK Worker's eVisa share code through Vouchsafe, from the review record. Its result, the GOV.UK PDF and the eVisa photo are kept for the employment and two years after. Not the same as the No right to work recorded risk signal. See UK right-to-work checks.
Risk signalIn Reporting & Risk: something a rule finds in the form answers (for example No right to work recorded), with its rating.
Scan site passThe QR icon at the top right for HR, EHS, the administrators and System Admin: it reads a Worker's site pass with the phone's camera inside Obtempera, and the check is recorded.
Site inductionWith the Site Induction add-on, the induction a Worker is given in person on site: EHS marks it on the Induction page, and the Worker confirms in Obtempera that they received it. Each Project says whether its Workers need one. An unconfirmed induction does not hold the Worker back. See Site Induction.
Site informationA Project's address and map link, access and parking, PPE, site contacts and photos, shown to the Workers on it.
Site passThe Worker's QR code in the Worker Portal, shown at the site gate once they are cleared for site. It renews itself every 4 minutes and each code works for 10, so a screenshot soon stops working.
SubcontractorA Contractor beneath another Contractor in the supply chain. Reach and visibility run downwards only.
Supply-chain mapThe Project page's chart of its Contractors, tier by tier, each with its Workers on the Project and its colour.
Survey messageA Pulse Survey sent from Communications to the same audience as a notice, without an audit; answered and reported as an audit's survey is.
Survey seriesRepeated pulse surveys grouped to compare their results by issue date; small groups are never shown.
Title that followsA question whose title and help change with another answer on the form, or with the form's country (the local identity number reads PPS No. on an Irish form).
TodayThe start page for everyone but a Worker: what is waiting for you. The Obtempera logo, top left, brings you back to it.
ToolkitOne country's Contractor Compliance Toolkit, under Toolkits in the account menu: a route that filters every tab, checklists, the requirements register, pay terms and a cost calculator, each requirement with its official source. Thirty countries, opened by invitation. See Country toolkits.
Training outstandingEvery review passed, but a course the Project requires is still to do: red, not cleared for site, until it is passed.
Two-step sign-inA code from an authenticator app after your password. Backup codes sign you in without the phone, each once.
View Obtempera asA System Admin looking at the product as another user, recorded, and never reaching a disclosure.
WorkerA person employed or engaged by a Contractor, or by the Customer directly. Most have a Worker Portal account; one without is reached by email only.